Thinking about the site in
general and where to site the library/learning space.
Previously, the BCC proposal to
redevelop this site, divided the area into three precincts, whether these three
precincts will be part of the "redeveloped" redevelopment, I have no idea.
Precinct 1
- hotel and tourism
Located on the western side of
the site and included the area under the Story Bridge. Existing sheds,
buildings and wharves were to be retained as part of development. A new
building was to be constructed under the Story Bridge.
Uses were
to include:
- short term accommodation
- restaurants
- shops
- tourism boat operators
- visitor centre
- offices
- indoor sport/gymnasium
- recreational facilities
Located
in the centre of the site and would have offered a combination of new buildings
(which are no more than three to four storeys in height) and public open space.
Uses were to include:
- restaurants
- retail
- galleries
- commercial opportunities
Located
on the eastern side of the site and would be primarily used for public open
space. The existing heritage listed buildings in this area were to be retained
and re-used for community purposes. This precinct was expected to host cultural
events and activities.
Uses were to include:
- park
- community facilities <<< This is where the library will fit.
- boat landing facilities
- conference centre facilities
- restaurants/cafes
- indoor sport and recreation
Reference:
No comments:
Post a Comment